Download document () of 20

B-Line seismic questionnaire

(Please provide the name of the customer who you would like us to contact with any questions)
(Please provide email for the contact above)
(Please provide phone number for the contact above)
(Name of Contractor / Engineer / EPC / Specificer....etc)
(Rep or sales personnel)
US = State; International = Country
(Note due to significant differences in the design code, this will affect what needs to be braced)
(For drop lengths greater than 10 ft. select cable)
(Design Load will determine how many braces are required)
(List out if trapeze is single or double tier, if conduit is on top and bottom of strut, or an other unique details)
(If yes, please be prepared to send in when requested)
(In the design phase we will need slab thickness, flute width and depths, concrete strength or beam spacing. Note the structure will affect how many braces are required)
(This will help determine how many rod stiffeners are required; value must be a number)
(Anchors must be ICC-ESR approved)
By submitting this form, I agree that the personal data that I provide can be shared with Eaton, channel partners and third-party providers working on behalf of Eaton in accordance with the Eaton Privacy Policy and in compliance with applicable data privacy laws.
I agree to be informed regularly about Eaton products, promotions and news. I understand and agree that Eaton will use my data to personalize marketing communications.  I agree that the personal data that I provide can be shared with Eaton Corporation plc in Ireland, Eaton Corporation in the United States of America and according to the Eaton Privacy Policy. Any use of my personal data will take place in compliance with the relevant and applicable data privacy laws and the Eaton Privacy Policy. I can change my preferences at any time, or withdraw my consent by clicking on the relevant links in Eaton’s email footers.